This proposed mine has been in the news a lot lately. There seem to be conflicting reports of the distance from the mine site to the boundary of the BWCA. Has anyone followed this project and have knowledge of the project?
I’ve seen the proposed site plan. 653 acres for 1.5 million tons of tailings, water on both sides of the site, shallow water table.We need to see the mitigation plan for hydrology in order to get an idea of the probability of contamination. This is a tough one to be objective about. I am just stating the obvious here, but plan to investigate the hydrology further.

As far as proximity, I was on Gabbro some years ago and could clearly hear the test drilling. It was almost loud.This proposed mine has been in the news a lot lately. There seem to be conflicting reports of the distance from the mine site to the boundary of the BWCA. Has anyone followed this project and have knowledge of the project?