So here a little up date on the shop.... The roof is finally on, working in the snow and a by yourself make things interesting and takes time!!
So after the insulation on the roof, a membrane was applied and then strapping and the "rafters" and more strapping to receive the tin!! Build some roof ladders for the gable ends and had a friend help installed those but the rest I was on my own... With the snow!!
Next step is taping the plywood seams with a special tape so the plywood act as a vapour barrier and then 4 inches of rigid insulation on top of that... At the same time I hope to get an electrician in to do all the wiring..... Still lots of work, building the frame for the big window, making the big front door and the man door, insulating and sheeting the inside!! But first I have to get on the rd for a trip to BC to get a camper!!